按摩高潮A片一区二区三区,YSL水蜜桃86满十八,免费A片全黄少妇内谢,学长别揉了我快尿了男男,雯雯在工地被灌满精在线播放

EN
The FGC system of the Xinxing Municipal Solid Waste Incineration Power Generation Project in Yunfu, Guangdong, undertaken by HEPT, has started construction
2025.05.30
The FGC system of the Xinxing Municipal Solid Waste Incineration Power Generation Project in Yunfu, Guangdong, undertaken by HEPT, has started construction since 20th. March 2025.
The total designed treatment capacity of household waste is 500 tons per day, equipped with a 1 × 500-TPD incinerator and a 1 × 12MW condensing steam turbine generator set. The FGC adopts the treatment process of "SNCR (not within the scope of this contract) + semi-dry desulfurization + dry powder injection system + activated carbon injection adsorption +SCR (without the scope of this contract) + bag filter + fly ash conveying, storage and stabilization", which is an EPC project by HEPT.
HEPT's references in Guangdong includes Dongguan Junye, Dongguan Jiulong, Shantou Chao Nan, Puning, Huiyang, Zhaoqing, Shantou Chenghai, Gaozhou, Zhongshan, Yunfu Xinxing, etc.
For more information, please click or scan below!
Follow us!