按摩高潮A片一区二区三区,YSL水蜜桃86满十八,免费A片全黄少妇内谢,学长别揉了我快尿了男男,雯雯在工地被灌满精在线播放

EN
The flue gas cleaning project of the municipal solid waste incineration power generation project in Ankang City, Shanxi Province, undertaken by Huaxing-east, has started construction
2024.07.30
The flue gas cleaning project of the municipal solid waste incineration power generation project in Ankang City, Shanxi Province, undertaken by our company, started construction on March 8, 2024.
The project is designed to process 1200 tons of household waste per day, with the construction of 2 × 600 t/d mechanical grate incinerators and 2 × 12MW sub high pressure medium temperature condensing steam turbine generators; Collaborative treatment of 100 tons/day (with a moisture content of 60%) of sludge from municipal sewage plants, followed by co firing treatment after drying. The flue gas cleaning process of "SNCR (urea)+semi dry method (rotating spray Ca (OH) 2)+dry method (Ca (OH) 2)+activated carbon adsorption+bag type dust removal+fly ash transportation, storage and stabilization process+SGH+SCR" is adopted for flue gas treatment, which is our EPC project.
Huaxing's performance in Shanxi Province includes:  Xianyang Xingping, Xi'an Gaoling, Xi'an Xixian,  Ankang, etc.
Click to enter!
Take you to explore - Huaxing East

Professional equipment supplier and system integrator in the field of flue gas cleaning (FGC)